Independent NM inspector
(505) 595-7203
Roof Doctor NM
Free verbal guidance · Written scope included with any report

A scope so contractors bid the same job.

Three roofing 'estimates' that look like they're for three different houses? That's because they are — every contractor scoped it differently. A written scope of work fixes that. Talking through scope with us is free; the full written version comes with any paid report.

10
Line-item categories
0
'Or equal' loopholes
3
Apples-to-apples bids in return
What's in a scope

Every line, spec, and code reference.

01

Tear-off & disposal

Layer count, roll-off size, dump fees, magnetic-sweep expectations.

02

Decking replacement allowance

Per-sheet unit price up to X sheets — beyond X, change-order rate specified.

03

Underlayment spec

Brand, model, weight, coverage. Ice-and-water membrane per code.

04

Shingle / tile / membrane spec

Manufacturer, model, color, weight class, warranty tier. No 'or equal' loopholes.

05

Ventilation calc

Net Free Area math per IRC 806 with intake/exhaust balance. Ridge vent linear feet spec'd.

06

Flashing spec

Step vs continuous, chimney cricket for width >30", kickout at wall terminations. Metal gauge specified.

07

Fastener pattern

Nails per shingle, sheet fastening pattern. Matches manufacturer high-wind warranty spec.

08

Warranty deliverables

Manufacturer registration, warranty tier, transferability, workmanship years.

09

Cleanup & protection

Landscape protection, satellite/solar disconnect, pet-safe cleanup, magnetic sweep 2x.

10

Documentation & permits

Municipal permit responsibility, inspection scheduling, close-out documents delivered.

How to use it

Send it to 3 contractors. Get back apples-to-apples bids.

Because they're all bidding the same specification, the only variables left are labor rate and overhead — which is exactly what price comparison should be about.

No more "my bid was cheaper because I used lighter underlayment."
Sample scope excerpt
LINE 04.02 — UNDERLAYMENT
  Material: GAF FeltBuster Synthetic
  Coverage: Full-deck, no exposed decking
  Overlap: 4" horizontal, 6" vertical
  Fasteners: Cap nails, 1" min penetration
  Ice-and-water: GAF WeatherWatch 36",
    all eaves, valleys, penetrations

LINE 07.01 — CHIMNEY FLASHING
  Type: Step + counter (16 oz copper)
  Cricket required: Yes (42" > 30" per IRC)
  Sealant: Geocel 2320 tripolymer
  Fasteners: SS ring-shank, min 1.25"
Next step

Get one scope. Get three real bids.

Free inspection + free scope walkthrough. Written scope is included with any paid report ($149+).

Next step

Ready when you are.

Three ways in. Pick the one that fits — no pressure.