Independent NM inspector
(505) 595-7203
Roof Doctor NM
Free HOA packet

NM HOA roof approval kit.

If you live in High Desert, Tanoan, Cabezon, Las Campanas, or any of the 200+ NM HOAs, your roof replacement needs Architectural Review Committee sign-off before work starts. Here's everything ARCs actually want to see — plus neighborhood-specific rules I've learned the hard way.

Submission checklist

The 12-item ARC packet

Print this, tick as you go. Most rejections happen because one of these is missing — not because the roof choice was wrong.

  • 01.Current CC&Rs and Architectural Guidelines (pull from your HOA portal)
  • 02.ARC application form (usually 2–4 pages, notarized in some communities)
  • 03.Contractor's NM GB-98 license number + certificate of insurance
  • 04.Manufacturer + product line + color name of proposed material
  • 05.Manufacturer color chip or physical sample (some ARCs require both)
  • 06.Site plan showing roof planes affected
  • 07.Photos of existing roof (all elevations)
  • 08.Photos of at least 2 neighboring roofs in same material/color for reference
  • 09.Timeline: proposed start date, end date, staging area
  • 10.Debris removal and daily cleanup plan
  • 11.Neighbor notification letter (required in ~30% of NM HOAs)
  • 12.Independent inspection report — many ARCs waive review time when included
Sample neighbor letter
Neighborhood-specific rules

NM HOAs I've submitted through

These are quirks I've documented from actual ARC responses. Your specific CC&Rs govern — always confirm.

High Desert (ABQ)

Requires ARC pre-approval. Tile-look shingle or standing-seam metal in earth tones only.

Tanoan (ABQ)

Strict color palette. Get color chip pre-approved before ordering material.

Sandia Heights

Wildfire overlay — Class A only. Concrete tile and metal preferred.

Rio Rancho — Cabezon

Standard CC&Rs. 30-day ARC review. Solar mounts need separate approval.

Rio Rancho — Enchanted Hills

Sub-associations vary. Confirm which micro-HOA you're in before submitting.

Corrales — Highlands

Rural feel preserved. No bright metal, no synthetic slate. Muted earth only.

Santa Fe — Las Campanas

Historic-district-adjacent standards. Pueblo-style flat roof + parapet mandatory on primary structures.

Placitas — Anasazi Trails

Reflectivity limits. High-albedo TPO may need variance if visible from adjacent lots.

Timeline

How ARC approval actually plays out

  1. Day 0
    You submit the packet

    12 items above. Most portals accept PDF; some still want physical color chips mailed.

  2. Days 3–7
    ARC acknowledgment

    If you don't hear back in 7 days, email the property manager. Half the time the packet is sitting in a spam folder.

  3. Days 10–25
    Committee review

    In-person or virtual meeting. You usually don't need to attend unless a neighbor objected.

  4. Day 30
    Written decision

    Approval, conditional approval (usually a color tweak), or denial with reasons. Denials can be appealed within 15 days.

  5. Day 30+
    Permit + start work

    Approval is required BEFORE the permit is pulled — the city won't issue one without it in HOA overlays.

Next step

HOA giving you a hard time? I'll write the report they want to see.

Book the free on-site inspection, or send a photo and we'll tell you what to do next. No sales pitch — we don't install roofs.