Every roof question, one independent desk.
Inspections, scopes of work, bid reviews, contractor matching, and post-work verification — no crew, no upsell.
Pick the piece you need
Before a homeowner spends $18–40k on a tear-off, an independent inspector should confirm it's actually needed and write a scope so…
Most 'you need a new roof' calls in NM are actually one bad flashing or a cracked pipe boot. We diagnose with moisture meter and I…
Buying? Selling? Insurance asking for a report? HOA reviewing an ARC packet? An independent third-party inspector produces a repor…
Once-a-year inspection with year-over-year photo comparison. The cheapest way to add 5–10 years to a roof is a written record of w…
During active monsoon events, the priority is documenting the damage for insurance and getting a scope written so a NM contractor …
Property managers and owners need condition reports that aren't written by the contractor bidding the work. We inspect TPO, EPDM, …
From Nob Hill bungalows to Rio Rancho production homes to North Valley adobes to Santa Fe pueblo-style parapets. Independent inspe…
An independent inspector's report carries weight your roofing contractor's bid does not. We document damage, translate findings in…
Most 'roof' leaks we're called to diagnose in NM are actually gutter or drainage problems. We inspect the whole water path — roof,…
Skylight failures are one of the top three leak sources on NM pitched roofs. Often it's not the glass — it's the curb flashing or …
Most NM roof work cracks adjacent stucco — parapet caps, wall-to-roof terminations, kick-out flashings. We inspect the transition …
Wind events take siding off too. We document what the storm damaged, spec the replacement, and hand you a packet that supports the…
Half the shingle failures in NM are heat failures from a poorly insulated, poorly ventilated attic. When a re-roof is on the horiz…
Ridge and soffit ventilation is code-required and often wrong. We measure existing intake and exhaust, run the IRC 806 balance cal…
Chimneys are the #1 leak source on pitched NM roofs. The fix is code-correct step + counter flashing with a cricket on the uphill …
Putting solar on a 15-year-old roof is a mistake — 25 years from now you'll pull the array to re-roof. We inspect the deck, calcul…
If a NM flat roof has 5+ good years of substrate left, a coating adds 10 more. If it doesn't, coating over failing membrane just d…
Not sure which service fits?
Take the 60-second matcher — we'll route you to the right report tier.