For NM homeowners going solar in the next 5 years

Do the roof first. Then the panels.

Panels last 25–30 years. A tired shingle roof lasts 5. Removing and re-flashing an array to re-roof underneath costs $3–7k. A solar-ready roof avoids all of it.

Right underlayment

25-year synthetic under solar zones — not 15-year felt. Panels shade heat, so premature UV isn't the killer; sub-panel condensation is. Synthetic breathes and outlasts the array.

Reinforced racking zones

We mark rafter locations on paper AND on the deck so your solar installer lags into structure every time — no toenailed truss chords, no split rafters.

Solar-compatible flashing

Flashings and vents relocated OUT of the future array footprint so the solar crew doesn't cut them, re-route them, or leak-test them a year later.

The math

Why the sequence matters.

Panels first, then re-roof later
  • Solar removal + reinstall: $3,000–$7,000
  • Panel warranty voided if solar company didn't remove them
  • 2–4 week outage of solar production
  • Original penetrations rarely line up with new shingle rows — re-flashing risk
Roof first, then panels
  • One roof, one solar install — 25+ years of alignment
  • Solar company lags into pre-marked structure, faster install
  • NO shading conflicts with old vents — better production
  • Both warranties intact and separate
What we do differently

Our solar-ready spec.

Rafter mapping

Chalk-lined and photographed for your solar installer before we cover the deck.

Conduit paths pre-planned

We coordinate with your solar company on where the DC/AC runs will exit the attic.

Class 4 impact shingle

Hail-rated shingle so a $30k panel array isn't sitting on a 3-tab that folds in a monsoon storm.

Panel-shade venting

Ridge and soffit vents relocated to the north/east eaves so shaded zones don't overheat the attic.

Reinforced deck

3/4-inch OSB in the solar footprint on older 1/2-inch decks — matches PV racking load.

Sequenced with your installer

We schedule the tear-off so your solar interconnect date isn't delayed. One project, not two.

FAQ

What NM solar-curious homeowners ask us.

My roof is only 12 years old. Do I really need to re-roof?

If it's a 30-year architectural shingle in good shape, no — we'll say so on the inspection. If it's a 3-tab or the felt is already brittle, doing solar on top locks in an expensive removal-reinstall later.

Does the solar company do the roofing?

Most don't — they subcontract. That's fine, but the two crews rarely coordinate on flashing or venting. When we roof first, we hand your solar company a paper map of every rafter.

How long between roof and solar?

As short as one week. We deliver the rafter map + as-built photos digitally. Your solar EPC uses them for the structural stamp.

Do you install the solar too?

No. Solar is its own trade. We stay in our lane (independent inspector roofing) and refer to two local NM solar EPCs we trust.

Going solar in the next 12 months?
Let's inspect the roof first — free.

We'll tell you honestly if it needs replacement or if you can go straight to panels.

Next step

One roof, one solar install — done right the first time.

Book the free on-site inspection, or send a photo and we'll tell you what to do next. No sales pitch — we don't install roofs.