Bond elections, PSFA master plans, and insurance renewals all want the same thing: defensible third-party roof condition data. I inspect NM K-12 buildings during summer break, deliver rolled-up capex before the fall board meeting, and format everything to match PSFA FCI documentation.
Bond-ready capital plan format
PSFA FCI-aligned condition scoring
Per-building capex table (immediate / 5-year / 10-year)
Summer scheduling — no operational disruption
Rolled-up district summary for the board packet
Signed independent report — no bid attached
Standardized walk of every accessible roof in the district. One PDF per building with roof system, age, condition, and remaining life. Rolled-up district capex spreadsheet aligned with PSFA FCI format. Summer scheduling to avoid disrupting instruction. Board-packet-ready executive summary. Signed by a licensed independent inspector — no contractor bid attached.
NM K-12 school districts, charter networks, and private schools. Facilities directors preparing PSFA master-plan updates. School boards evaluating bond-election roof capex. Districts responding to insurance-carrier condition requirements. Charter-school networks with multi-campus facility portfolios.
Single Building (Small K-8) — $649 Single Building (Large HS) — $1,200 District Portfolio (5–15 buildings) — $549/building District Portfolio (16+ buildings) — $449/building PSFA FCI Format Add-On — $200/building All district pricing includes the rolled-up capex spreadsheet plus individual PDFs. Summer-break scheduling standard.
Internal staff know your buildings, but a third-party report gives the board defensible documentation for bond elections, insurance, and vendor accountability. I complement your facilities team — I don't replace them.
Yes for districts up to ~40 buildings within a 60-mile radius. I schedule inspections during summer break to avoid disrupting operations and deliver rolled-up capex before the fall board meeting.
Yes. My report format aligns with NM Public School Facilities Authority documentation requirements for FCI (Facility Condition Index) input and 5-year master plan updates.
Party-wall + shared-roof attribution.
Step, counter, cricket flashing audit.
SMACNA sizing + downspout audit.
Bid + scope compared line-by-line.
I've watched too many neighbors sign contracts they didn't understand for roofs they didn't need. That stops with a written report they own.